This one started with demolition. The old soffits above the cabinets came out, the walls were stripped of tile and cabinets, and sections of wall and ceiling were opened up for new wiring.
From there the room was rebuilt from the bones out: new drywall, recessed LED lighting, a new plywood subfloor, primer and a soft gray paint.
Then came the finish work. Gray cabinets and a stainless range hood, luxury vinyl tile, stainless appliances with under cabinet lighting, white quartz countertops, and white subway tile run all the way up the wall behind the range.



