The walls came down to the studs and block, and the concrete floor was cut open to run a new shower drain.
Then came the rough in: framing, insulation and plumbing, followed by moisture resistant drywall and a new exhaust fan, which a basement bathroom needs.
The finished room has a walk in shower with glass sliding doors, a grab bar and corner shelves, plus a shaker vanity and a stone look floor.



